
Enquiry • RFQ • Site Mobilisation
Let's Build Your Next Industrial Project.
Share your installation, automation or commissioning requirement. Our senior engineering team conducts drawing reviews and site discussions within 24 hours.
Direct Project Line
+91 8090446627
Speak directly with our technical project coordinators.
Official RFQ & Drawings
info@gomanpowerservices.com
Send drawings, scope specs, or tender documents.
Mobilisation Coverage
Pan-India Deployment
Teams deployed across major industrial and automotive belts.
Project Working Desk
Mon – Sat: 09:00 – 18:00
24/7 on-site technical support during active commissioning phases.
Engineering Engagement
From Drawing Study to Shop Floor Execution.
Whether you are planning a greenfield automated line, retrofitting control panels, or preparing for a scheduled shutdown window, we align technical manpower and equipment to your exact milestones.
- ✓Strict Drawing & Tolerance Adherence:
Execution carried out to approved GA drawings, electrical schematics and manufacturer specifications.
- ✓Bilateral NDA & Confidentiality:
Complete protection for proprietary plant layouts, machine patents, and cycle-time designs.
- ✓Zero-Compromise Safety Standards:
PTW compliance, LOTO discipline, certified PPE, and daily safety toolbox talks.
+91 8090446627
For rapid emergency response or direct quotation consultations.
Engagement Roadmap
What Happens After You Submit Your RFQ.
A transparent, staged onboarding sequence engineered to minimize delays and ensure accurate site mobilization.
- 01Within 24 Hours
Scope & Drawing Review
Our project engineer analyzes your SLD, layout drawings, machine specs, and timeline requirements.
STAGE 01 - 02Day 1 – 2
Technical Alignment & Survey
We discuss battery limits, cable routing, foundation datum, and site access conditions.
STAGE 02 - 03Day 3
Method Statement & Proposal
You receive a structured commercial BOQ, execution timeline, and safety method statement.
STAGE 03 - 04Per Schedule
Mobilisation & Commissioning
Certified electricians, mechanics, automation leads and calibrated tools deploy on-site.
STAGE 04
Frequently Asked Questions
Project Engagement & Site Readiness.
Clear guidelines on how we handle RFQs, confidential drawings, plant safety compliance and site inspections.
Have a unique site requirement?
Our engineering team is available for virtual or physical technical alignment meetings.
Call +91 8090446627 →For control panel and electrical scopes, single-line diagrams (SLD) and panel GA drawings are ideal. For complete line or conveyor installation, plant layout drawings, machine footprints and target cycle-time requirements help us prepare a precise method statement and BOQ.
For planned projects, we mobilise within agreed schedule windows. For critical plant shutdowns or emergency commissioning support, our rapid deployment teams can mobilise within 24 to 48 hours across major Indian industrial corridors.
Yes. Every technician is trained in Lockout/Tagout (LOTO) protocols, Permit-to-Work (PTW) compliance, mandatory PPE discipline and electrical safety standards required by Tier-1 automotive and industrial manufacturing plants.
Absolutely. We routinely sign bilateral NDAs before reviewing proprietary layout drawings, cycle-time studies, or machine schematics with OEMs and manufacturing clients.
Yes. Our senior project engineers conduct pre-execution site surveys to inspect floor conditions, datum points, power drop locations and cable routing routes before finalising the scope.