Weld Shop Line Installation
Installation of weld shop lines including fixtures, jigs, weld cells, fume extraction routing and associated electrical and control infrastructure.
- Referenced fixture setting
- Datum
- Interlock testing
- 100%
- Utility routing scope
- Full
Overview
Weld cells, fixtures, interlocks and utilities installed to spec.
Weld shop installation demands tight positional accuracy and disciplined safety integration. Fixture location, clamp sequence and cell interlocking all have to be right before the first weld is struck.
We install fixtures and jigs to datum, erect cell fencing with door and light-curtain interlocks, route weld power, air and cooling water, and validate cell sequences with the automation team.
- Safety Interlocks
- Light Curtains
- PLC Safety I/O
- Profinet
- Pneumatic Clamping
Scope of Work
- 01Fixture and jig positioning to datum
- 02Weld cell fencing, gates and interlock installation
- 03Weld power, control and ground cable routing
- 04Compressed air and cooling water line support
- 05Fume extraction ducting support and routing
- 06Cell interlock and sequence validation
Execution Process
How We Deliver This Scope.
- 01
Datum Setting
Floor marking and reference datum established for fixture placement.
- 02
Fixture Installation
Jigs and fixtures positioned, levelled and anchored to tolerance.
- 03
Cell Build
Fencing, gates, light curtains and access points installed.
- 04
Utility Routing
Weld power, air, water and extraction routed and connected.
- 05
Safety & Sequence Validation
Interlocks proven, emergency stops tested, cell sequence verified.
On Site
Work Environment.
IMG / 01
IMG / 02
IMG / 03What You Receive
Deliverables.
- Installed weld cells and fixtures
- Safety interlock test record
- Utility connection sign-off
- Cell sequence validation
Need this scope on your site?
Send us your drawings and timeline — we'll revert with an execution plan.
FAQ
Questions About This Service.
We handle the installation, fencing, utility and interlock scope around robotic cells, working alongside the robot OEM for programming and calibration.
Yes. Interlocks, gate switches, light curtains and emergency stop circuits are tested and recorded before hand-over.
Start a Project
Have an Industrial Project in Mind?
Let's discuss the installation, automation or commissioning requirements for your next project.